2012 Key Largo - Long Island, NY
2012 Has been a big year for the Mainship. We removed the Flybridge to address rot issues up top. The salon was fit with an L shaped sette and a table, which is split in 2 for easier access into the hatches. There is a mid sized cabinet on the starboard side. Yasha built a box for the captains chair. The walls will sprayed with Awlgrip, snow white. The air conditioner will fit in the box and a beautiful Stidd chair has been attached to the top. A second Stidd chair was fixed on the port side. In addition to all of the work that happened, we made the voyage from Key Largo, Florida to Marsh Harbor in the Abacos, Bahamas towing the 17' Twin Vee. After a few weeks in paradise, we bee lined straight to work on the south side of Long Island.